Commercial Office Refurbishment

Project Details

24 Cornhill is a 6-floor office block in London. We maintain the whole buildings air conditioning systems. This project on the 2nd floor was to replace the existing Daikin VRV System with a Mitsubishi Heat Recovery System.

  • Removal of the 18 no. existing indoor units
  • Installation of the new indoor units in approx. the same position
  • Re-pipe to the existing pipework
  • Reconnect existing 415v 32A power supply with new isolators
  • Install two new BC boxes and additional 13A spurs together with steel plates for the installation
  • Run new screened control cables between roof and first floor level
  • Electrical testing of power supplies and minor works certificate

Outcome:
This project was completed on time and on budget. It was over a two-week period but with the team of 7 engineers working nights to alleviate the disruption to the daytime running of the office.